5 steps 20 min 7 questions

PDCA

PDCA provides a four-phase framework for solving a shop floor problem based on measurements rather than impressions, and then for locking in the result with a standard so the wheel does not roll back down.

Create an account I already have an account

You can also sign in with your account from a TEEPTRAK site, without creating a password.

This course is intended for team leaders, methods technicians, continuous improvement facilitators and maintenance or quality managers who have to deal with a recurring problem on a line: repeated stoppages, scrap, OEE that stagnates. It assumes no prior Lean training.

By the end, you will know how to write a quantified problem statement and a SMART objective, trace back to root causes with the 5 Whys or an Ishikawa diagram, prioritise with a Pareto, test an action within a bounded scope, decide on comparable measurements whether it worked, and then record it in a standard. You will also know how to spot the three mistakes that cause most PDCAs to fail: starting from a solution, skipping the Check, not standardising.

What you will be able to do

  • Name the four phases of PDCA and state what each one concretely produces on a production line.
  • Write a quantified problem statement and a SMART objective with the measurement indicator chosen before taking any action.
  • Trace back to root causes with the 5 Whys or an Ishikawa diagram, then prioritise with a Pareto.
  • Run a test within a bounded scope and decide, on comparable measurements, whether the action worked.
  • Standardise what works (the standard as the wedge for the wheel) and launch another cycle when the gap persists.
  • Recognise the three mistakes that cause the majority of PDCAs to fail: starting from a solution, skipping the Check, not standardising.

The path

  1. Why a wheel, and why it turns in one direction only 4 min
  2. Plan, first step: frame the problem and set the objective 4 min
  3. Plan, part two: finding the causes and choosing the actions 4 min
  4. Do and Check: test within a bounded scope, then really measure 4 min
  5. Act: wedging the wheel with a standard, or running another cycle 4 min

Prerequisites

No Lean prerequisites. You need to know how your line operates and have at least one indicator that is recorded regularly (stoppages, scrap, throughput rate, OEE). Having a real problem in mind helps to follow the examples.

The closing quiz

The topic ends with a 7-question quiz, and a certificate is issued on success.

Create an account